Feasibility Verdict
--
Overall Score
--
Capex Saving
--
Annual Opex
--
Optimal Pin Shift
--
Spatial Intelligence
Selected Site
Donor Tower
Nearby Tower
Search Ring
1.5 km Ring
Ground Elevation
--
Terrain Slope
--
Nearest Tower
--
Nearest OFC
--
Assessment Health
All Systems NominalOverall Health
(Green Zone)
Field Verification Priorities
--
Critical Actions
--
Field Hours (Est.)
| Action Item | Priority | Est. Time |
|---|
Financial Snapshot
CAPEX
--
Monthly OPEX
--
Solar PV
--
Annual CO₂ Offset
--
3D Terrain Digital Twin (MapLibre GL)
30m DEM 60% Fresnel LoS Profile
--
--
Hover chart to sync crosshair on 3D map
| Donor | Dist | Clr | 6G | 15G | 80G |
|---|
McKinsey-Standard Financial Ledgers & Scenario Simulator
Avoided Build Capex (Δ_Capex)
--
5-Yr Solar Opex Alpha
--
Road-Trench Fiber
--
1.0x vs 2.0x RoCE
--
10-Yr IRR
--
NPV @12%
--
Payback
--
Monthly EBITDA
--
| Capex Line Item | ₹ Lakh | % Share |
|---|---|---|
| Civil & Foundation | -- | |
| Tower Structure | -- | |
| Solar + LiFePO4 Power | -- | |
| Backhaul (Fiber / MW) | -- | |
| Edge / EV Add-On | -- | |
| Total Capital Expenditure | -- | 100.0% |
| Opex Line Item | ₹ / Mo | ₹L / Yr | % Share |
|---|
| Scenario | Rev/mo | EBITDA/mo | Ann EBITDA | 10-Yr IRR | NPV @12% | Payback |
|---|
IS 875 Wind & Soil Foundation
--| Parameter | Specification |
|---|
2024 RoW & 7 km SACFA:
--
--
Zero-Diesel ESG & Carbon Ledger
--| Metric | Value |
|---|
Telecom Act 2023 & GatiShakti RoW
--| Gate | Status | Nearest | Authority |
|---|
2030 Beyond-Tenancy (Edge / EV)
----
Full Surgical SOA Field Verification Checklist
9-Engine Evidence Audit ("Show Your Math")
Road Access--
--
Bearing: -- • --
Power Grid--
--
Bearing: -- • --
BharatNet Fiber--
--
Bearing: -- • --
Demand Anchors (2.0 km)--
--
Offline R*Tree SQLite POIs
IoP Proximity Map (500m Ring & 2.0km Macro Buffer)
Demand POI Categories & Major Highways
OFFLINE SQLITETop 3 Nearest Major Roads (Motorway / Trunk / Primary / Secondary)
| Road Name | Class | Dist | Bearing |
|---|---|---|---|
| Loading... | |||
Nearest Exclusion Zone
--
Nearest 15 Demand POIs (Click row to focus map)
--| POI Name | Category | Sub-Type | Distance | Bearing |
|---|---|---|---|---|
| Loading offline Demand POIs... | ||||
Drag & Drop CSV or Excel (.xlsx) Search-Ring Sheet (up to 500 rings)
Auto-normalizes DD, Swapped Lon/Lat, DMS & UTM 42N-46N • Runs Pre-Survey Rejection Triage
Survey Cost Avoided: ₹0
No batch uploaded
| Site ID | Triage Status | Rejection / Risk Codes | Co-Lo Gate | RoW Authority | Score | Δ_Capex Avoided |
|---|---|---|---|---|---|---|
| Upload a CSV/XLSX file to begin Pre-Survey Rejection Triage. | ||||||
Submit Physical Field Candidates (A / B / C)
Ring: RAJ-KOTA-001Candidate A
Candidate B
Ranked Candidate Comparison & Winner
--| Rank | Candidate | Structure | Penalties | Capex | RoCE |
|---|---|---|---|---|---|
| Submit Candidate A/B/C returns to rank by Site-Level Pre-Tax RoCE. | |||||